We invite you to view photos of site activity. This page will be updated periodically.

Summer 2020 - north digester hopper pour
Summer 2020 – north digester hopper pour.
Summer 2020 looking east
Summer 2020 – view from scaffolding, looking east.
Summer 2020 foundation pour
Summer 2020 – foundation pour.
Spring 2020 NSWWTP Construction view
Spring 2020 – view from tower crane #1 facing east.
Spring 2020 - NSWWTP Tower Crane View
Spring 2020 – view from tower crane #1 facing south and digester construction.
Spring 2020 - NSWWTP construction
Spring 2020 – view of digester construction and excavation from the site.
Nswwtp crane
Winter 2020 – View from tower crane #1 facing east.

Winter 2019 – Time-lapse of concrete pour.

20191106ToweCrane South View (1)
Fall 2019 – View from tower crane #1 facing south.
20191107_preload-from-tower-crane.jpg
Fall 2019 – View from tower crane #1 facing east.
20191104 Tower Crane on Site
Fall 2019 – Tower crane #1 facing west.
Rock Truck Van
Fall 2018 – A rock truck moves pre-load on site looking south.
20181206_134556
Fall 2018 – A rock truck moves pre-load on site looking east.
Screen Shot 2018-10-23 at 10.33.05 AM
Summer 2018 – Equipment maintenance.
Screen Shot 2018-10-23 at 10.33.29 AM
Summer 2018 – Pre-load activity and material deliveries looking east.
Screen Shot 2018-10-23 at 10.33.58 AM
Summer 2018 – Pre-load activity on the west end of site.
Screen Shot 2018-10-23 at 10.34.35 AM
Summer 2018 – Pre-load activity on the west end of site.
Screen Shot 2018-10-23 at 10.35.05 AM
Summer 2018 – Equipment maintenance and general site activity looking towards Philip Avenue.
Screen Shot 2018-10-23 at 10.35.23 AM
Summer 2018 – Pre-load activity on the west end of site.